Government Contracting
550 Men’s Locker Room Remodel- Demolition, Plumbing, Tile work, Terrazzo, Doors and Hardware, Custom lighting, Framing, Sloping of floor to drain, Drywall, Core Concrete, Install Plumbing/ drainage for showers and locker room changing areas, Install bathroom hardware, Install lockers, Paint, Electrical work for switches and lighting
Virginia Square ASB Renovation – Demo 1200 Sq Ft of Ceiling tile and grid, Demo 112 LF of wall deck to deck including doors and frames, Install Drywall partitions, install side light doors and frames, Paint, Install new ceiling grid and tile, Repair Carpet, Install carpet base, Install safety locks, Install duplex receptacles, Relocate switches, Install ceiling mounted Sensor Switch CM9 occupancy sensors, Recircuit existing lights, Relocate Fixtures, Relocate thermostat, Demo and install new HVAC duct work as needed, Demo, relocate, and add sprinkler heads and pipes as needed, Subfloor repair, Install carpet
Commercial Contracting
White Box Lobby – Demo: Ceiling, walls, flooring, electrical in demo walls, doors, millwork, teller windows, lighting, ceiling tile and grid, flooring carpet and tile; Clean up Interior walls, Paint
Replace/repair water damaged drywall in Wells Fargo; Paint water damaged areas after repairs; remove/ repair and re-caulk wood trim as needed and paint.
Mens restroom remove wet drywall on 2 walls, replace, p/p and re-install ceramic base and cove base
Ladies restroom remove drywall, replace damaged framing, p/p and re-install ceramic base and cove base
Services & Maintenance
Projector’s lift- Modify overhead supports to accommodate the new orientation of the projector’s lift, Modify existing ceiling grid and ceiling tiles to accommodate the new orientation of the projector’s lift, Modify electrical power to the projector’s lift as necessary, Modify existing spiral ductwork to the existing ceiling linear diffusers as necessary
Lockers – Remove temporary walls covering the alcove for the new lockers, Patch and paint any damaged created by the removal of the temporary walls, Install lockers, Touch up any damaged paint created by the installation of the lockers
Epoxy new cement pad – prep, remove existing epoxy at floor to apply joint filler to prevent cracking between new and old cement, apply BASF Master Top TC 683 To match
Lab Boiler Room Leak – Remove equipment, base, drywall, in areas as directed (Two Trips) Replace insulation, Drywall 2 layers, patch & paint, provide new cove base & install, caulk top and bottom of base color match, reinstall two tank racks and caulk.
MRP Door Replacement, Lab Access Door Relocation and Replacement
Have a project for us to partner on?
Start your new project with Absolute, RSD today.

































